super-productivity/ARCHITECTURE-DECISIONS.md
Johannes Millan 8e810edbe7
fix(sync): make marked project deletions win LWW conflicts (#9009)
deleteProject cascade-deletes a project's tasks, notes, sections, repeat
config, and archive data in one reducer pass. When that op lost an LWW
conflict to a concurrent project edit, only the PROJECT entity was
reversed: every client resurrected an empty project and the winning
client's status-blind hydration replay cascaded its tasks away after a
restart (live state != post-restart replay).

Rather than recreate every cascaded entity (payload scales with project
size and cannot restore every side effect safely), give schema-v4
deleteProject operations explicit delete-wins precedence:

- new deleteProject actions carry a shared PROJECT_DELETE_WINS_MARKER; the
  shared LWW planner accepts a host-supplied delete-wins classifier. A
  marked remote delete is applied regardless of timestamps; a marked local
  delete is replaced with one op whose vector clock dominates both sides.
- historical unmarked (schema-v3) deletions keep timestamp-based LWW; the
  absence of the marker (never added by the no-op v3->v4 migration) is the
  real discriminator, and a schema v3->v4 barrier (mirroring v2->v3) makes
  older clients block on the newer-schema gate instead of mis-resolving.

Delete-wins plans reuse the archive-win resolution pipeline, so they
inherit its atomic persistence and losing-op rejection, and disjoint
merge leaves them untouched (the delete must win the whole entity).

Hardening from multi-agent review:

- union allTaskIds/noteIds across multiple concurrent marked deletes for
  the same project, so a single replacement cannot leave orphan tasks on
  clients that only receive it (the task reducer removes by allTaskIds).
- gate the classifier on the AUTHENTICATED payload projectId matching the
  plaintext entityId, so a tampered/replayed delete retargeted onto a live
  entity cannot silently drop a concurrent edit.
- guard a null/undefined delete payload in the classifier instead of
  throwing and wedging the conflict pass.
- pin the server's legacy-misc conflict alias to the fixed v1->v2 split
  boundary, not CURRENT_SCHEMA_VERSION, so this bump does not fabricate
  false GLOBAL_CONFIG:misc/tasks conflicts during rollout.
- bind the marker with a shared const (compiler-checked on producer and
  consumer) and rename _isArchivePlan -> _isWholeEntityWinPlan.

Documents the policy as ARCHITECTURE-DECISIONS.md #7.

Addresses #8997.
2026-07-14 19:58:33 +02:00

19 KiB

Architecture Decision Records

This document tracks significant architectural decisions and patterns in the Super Productivity codebase. When making changes that affect these patterns, reference this document and update it if needed.

Active Patterns & Decisions

1. dueDay/dueWithTime Mutual Exclusivity Pattern

Status: Active (since commit 400ca8c1, 2026-01-29)

Decision: The task.dueDay and task.dueWithTime fields are mutually exclusive in new data. When setting dueWithTime, dueDay must be cleared (set to undefined). When reading, dueWithTime takes priority over dueDay.

Rationale:

  • Prevents state inconsistency bugs where both fields had conflicting values
  • Single source of truth for task scheduling
  • Simpler state management

Implementation:

  • Writing: Clear dueDay when setting dueWithTime (in meta-reducers)
  • Reading: Check dueWithTime first; only check dueDay if dueWithTime is not set (in selectors)
  • Legacy Data: Old data with both fields works via priority pattern (no migration needed)

Key Files:

When to Update This Pattern:

  • Adding new date/time scheduling fields
  • Modifying task scheduling logic
  • Working with task selectors that check due dates

2. TODAY_TAG Virtual Tag Pattern

Status: Active (established pattern)

Decision: TODAY_TAG (ID: 'TODAY') is a virtual tag whose membership is determined by task.dueWithTime or task.dueDay, not by task.tagIds. The tag's taskIds field stores only the ordering of tasks, not membership.

Key Invariant: TODAY_TAG.id must NEVER be added to task.tagIds

Rationale:

  • Uniform move operations across all tags (virtual and regular)
  • Single source of truth for "today" membership (date fields, not tagIds)
  • Self-healing ordering (stale entries automatically filtered)
  • Natural integration with planner (which uses date fields)

Related: Uses the dueDay/dueWithTime mutual exclusivity pattern (Decision #1)

Key Files:

When to Update This Pattern:

  • Adding new virtual tags
  • Modifying tag membership logic
  • Working with today's task list

3. Sync Package Boundary Direction

Status: Active (since May 2026)

Decision: Operation-log sync code is split by dependency direction: src/app composes host-specific wiring, @sp/sync-providers owns bundled provider implementations, and @sp/sync-core owns framework-agnostic reusable sync primitives.

Rationale:

  • Keeps reusable sync algorithms independent of Angular, NgRx, app models, and provider implementations
  • Prevents provider IDs, app action/entity enums, validation schemas, UI, OAuth, and platform bridges from leaking into the core engine package
  • Gives boundary lint a clear rule: packages never import app code, and providers consume only public sync-core exports

Implementation:

  • ESLint rejects Angular, NgRx, app, shared-schema, sync-core deep imports, and dynamic imports inside package sources
  • @sp/sync-core has no runtime dependencies and owns vector-clock algorithms used by client/server compatibility paths
  • packages/shared-schema compatibility-re-exports generic vector-clock algorithms from @sp/sync-core; @sp/sync-core must not import @sp/shared-schema
  • @sp/sync-providers depends on public @sp/sync-core plus provider runtime helpers, while app factories inject credentials, platform bridges, validators, OAuth routing, and config

Documentation: docs/sync-and-op-log/package-boundaries.md

Key Files:

When to Update This Pattern:

  • Moving sync code between app and packages
  • Adding a package export or dependency
  • Adding a provider implementation or plugin-facing provider contract
  • Changing vector-clock ownership or shared-schema compatibility

4. Batch Uploads Under RepeatableRead

Status: Active (since May 2026)

Decision: SuperSync batch uploads derive conflict-safety from the shared user_sync_state.lastSeq row write that reserves server sequence numbers, not from PostgreSQL RepeatableRead snapshot isolation alone.

Rationale:

  • PostgreSQL RepeatableRead does not provide full serializable snapshot isolation
  • Two concurrent upload transactions can both pass conflict prefetch checks when they read the same pre-insert snapshot
  • Reserving sequence numbers through one user_sync_state.lastSeq row forces accepted writers for the same user to serialize on that row lock
  • A causal REPAIR snapshot must prove that its state includes the current server prefix; the same row serializes that base-cursor check with later writes
  • If two batches race, the later writer blocks on the row and the transaction retry path handles the serialization failure rather than silently accepting conflicting operations

Implementation:

  • Batch upload conflict detection runs in memory against prefetched latest entity rows and updates that map as operations are accepted
  • Accepted operations reserve one contiguous sequence range with INSERT ... ON CONFLICT ... DO UPDATE SET last_seq = last_seq + delta
  • The batch insert does not use skipDuplicates; an unexpected unique conflict aborts the transaction and lets the request retry
  • REPAIR uploads persist repairBaseServerSeq on the operation row. The HTTP handler rejects an obviously stale base before quota cleanup, and the upload transaction repeats the check under SELECT ... FOR UPDATE before insertion
  • Markerless legacy repairs are compatibility records, not causal boundaries: they cannot drive download fast-forward, snapshot trust, history pruning, or server-generated restore points; snapshot replay across one fails closed
  • Removing or sharding the lastSeq write requires replacing this safety mechanism with an equivalent per-user serialization primitive

Documentation: docs/sync-and-op-log/diagrams/02-server-sync.md

Key Files:

When to Update This Pattern:

  • Changing upload conflict detection
  • Changing server sequence assignment
  • Changing transaction isolation for upload operations
  • Changing repair base-cursor validation or full-state history pruning
  • Introducing multi-writer or multi-region upload processing

5. Project Completion: Decoupled Resolution over Atomic Multi-Entity Op

Status: Active (since 2026-06-06, branch feat/completing-projects-48eeb4)

Decision: "Complete project" is a plain single-entity PROJECT flag flip (completeProject, OpType.Update, mirroring archiveProject → sets isDone/doneOn/isArchived). The accompanying resolution of unfinished tasks ("move to Inbox" / "mark done") runs first, as the normal per-task actions (moveToOtherProject / updateTask isDone) dispatched in a loop with the Rule #6 bulk-dispatch flush — not bundled into a single atomic multi-entity op.

Rationale: An earlier iteration made completion one atomic Batch op (completeProject) that marked/moved tasks inside the project-shared meta-reducer. Because that op deliberately routed around the normal per-task actions, every system that observes those actions had to be re-taught about completeProject separately:

  • Conflict detection needed a whole new affectedEntities multi-entity-ref feature threaded through sync-core, the sync server (+ a Prisma migration), shared-schema and the op-log — ~1,565 LOC, of which completeProject was the only producer.
  • Native-reminder cancellation, issue two-way-sync, time-block sync and repeat-cfg effects each needed a dedicated completeProject listener to re-derive the task changes the atomic op skipped.

The atomic op's headline benefit — reversing the whole thing as one unit — was never realized: reopenProject only clears the project flags; it does not un-move or un-complete the resolved tasks. So the bundle paid a large cross-cutting cost for an undo guarantee it didn't provide. Decoupling makes the existing effects and per-entity conflict detection fire naturally and deletes ~1,750 LOC total (revert + decouple). Trade-off accepted: completion now emits N+1 ops (one per resolved task + the flag flip) instead of one, and there is a brief intermediate state — both fine for a rare, user-initiated action whose resolution is not atomically reversible anyway. One behavioral nuance vs. the old atomic op: when unfinished work is moved to Inbox, a task that was being actively tracked stays the current task (it was carried forward, not finished — consistent with Inbox's carry-forward intent); the mark-done path stops tracking the current task via the existing autoSetNextTask$ effect. The atomic op cleared the current task in both cases; the decoupled design intentionally keeps it for the carry-forward case.

Implementation:

  • Action/reducer: completeProject({ id, doneOn }) in project.actions.ts; on(completeProject) flag flip in project.reducer.ts (guards INBOX_PROJECT). reopenProject clears the flags only.
  • Service: ProjectService.complete(id, doneOn) dispatches the flag flip; moveTasksToInbox() / markTasksDone() loop the normal per-task actions + setTimeout(0) flush.
  • Flow: work-context-menu resolves unfinished work before calling complete().
  • Do NOT reintroduce a multi-entity completeProject op or affectedEntities for it without re-justifying the full downstream cost above. Prior atomic implementation is preserved in history at commit 0893a86162.

Key Files:

When to Update This Decision:

  • Adding a true bulk meta-reducer action for general use (revisit whether completion should adopt it)
  • Reworking how completion resolves unfinished tasks
  • Any proposal to make completion a single synced op again

6. Passkeys Stay Pending Until Email Verification

Status: Active (since July 2026)

Decision: A passkey submitted during account registration is stored as a PendingPasskeyRegistration tied to its exact email-verification token. It is promoted to the user's active Passkey set only when that token is consumed.

Rationale:

  • A WebAuthn registration ceremony proves possession of a credential, not ownership of the email address entered alongside it.
  • Storing a submitted credential directly on an unverified user lets an attacker pre-register a victim's address, then have the victim's later magic-link verification activate the attacker's passkey.
  • Keeping separate pending attempts prevents concurrent registrations from replacing or activating one another. The email owner chooses the credential by consuming the link produced by that same registration attempt.
  • Failed email delivery leaves the bounded, expiring pending attempt in place. Deleting the shared unverified user can race a concurrent registration and invalidate a link that was successfully delivered.

Implementation:

  • Passkey registration stores no active credential and creates one pending row per verification token.
  • Email verification atomically claims the unverified user, replaces active passkeys with the credential bound to that token, and deletes the user's remaining pending attempts.
  • Passkey verification tokens live only on pending registrations; user-row verification tokens belong to magic-link registrations. Consuming a user-row token verifies the email but removes untrusted active and pending passkeys.
  • The migration moves the latest legacy credential for each unverified user to the pending table and removes all active credentials from unverified users.
  • The resend cap bounds pending rows per unverified account; rows also expire with their verification tokens.

Key Files:

When to Update This Pattern:

  • Changing passkey enrollment or email-verification flows
  • Adding another credential type to registration
  • Changing verification-token persistence or cleanup

7. Versioned Delete-Wins Semantics for Project Deletion

Status: Active (since July 2026)

Decision: Project deletions created with schema v4 or newer carry an explicit projectDeleteWins marker and beat concurrent project updates. Historical, unmarked deletions keep timestamp-based LWW semantics.

This is a deliberate semantic trade-off: a concurrent project rename or field edit that is vector-clock CONCURRENT with a marked delete loses, regardless of which has the newer wall-clock timestamp. Deleting an entity another device is editing wins over the edit — the alternative (timestamp LWW) resurrects an empty project shell and silently loses its task subtree. The lost edit is only recoverable via local undo, not via sync.

Rationale:

  • deleteProject is one user intent whose reducer cascade removes the project, active tasks, notes, sections, repeat configuration, and related archive data. Reversing only the project entity after that operation loses data and violates replay determinism.
  • Capturing every cascaded entity in the delete payload or emitting restoration sidecars makes payload size scale with project size and still cannot restore every side effect safely.
  • Deletion is the only complete, deterministic result already represented by the operation. A concurrent rename or project-field edit must not partially undo it.
  • The schema-v4 barrier makes clients that do not understand this conflict policy stop before applying the operation (they block on the newer-schema gate rather than mis-resolving). The absence of the payload marker on historical deletions — never added by the no-op v3→v4 migration — is what preserves their timestamp-LWW semantics; the marker, not the version number, is the real discriminator. The classifier additionally requires the marked delete's plaintext entityId to match its authenticated payload projectId, so a tampered/replayed delete retargeted onto a live entity cannot win.

Implementation:

  • New deleteProject actions include projectDeleteWins: true; replacement delete operations preserve that payload.
  • The shared LWW planner accepts a host-supplied delete-wins classifier. A remote marked delete is applied regardless of timestamps. A local marked delete is replaced with one operation whose vector clock dominates both conflict sides.
  • SuperSync keeps its generic conflict protocol: if the first delete upload is rejected, the existing retry path uploads the causally dominant replacement. File-based providers use the same client planner and marker.
  • Do not add per-task/note restoration operations or project-sized snapshots to compensate a losing marked project delete.

Key Files:

When to Update This Pattern:

  • Changing the cascade performed by deleteProject
  • Adding another operation with delete-wins conflict semantics
  • Changing schema compatibility or LWW replacement behavior

How to Use This Document

When Making Architectural Changes

  1. Before implementing: Check if your change affects any active pattern
  2. During implementation: Follow the documented patterns
  3. After implementation: Update this document if you've:
    • Changed an existing pattern
    • Added a new architectural pattern
    • Made a decision that affects future development

When to Add a New Decision

Add a new decision record when:

  • The decision affects multiple files/modules
  • Future developers need to understand "why" not just "what"
  • The pattern needs to be followed consistently across the codebase
  • The decision prevents a specific class of bugs

Decision Record Template

### N. [Pattern/Decision Name]

**Status**: ✅ Active | 🚧 Draft | ⚠️ Deprecated | ❌ Superseded

**Decision**: [One-sentence summary of the decision]

**Rationale**:

- [Why was this decision made?]
- [What problems does it solve?]

**Implementation**:

- [How is it implemented?]
- [Key techniques or patterns used]

**Documentation**: [Link to detailed docs]

**Key Files**: [List of primary files implementing this pattern]

**When to Update This Pattern**: [Scenarios when someone should review/update this]


Commit Reference

When committing changes related to these patterns, reference this document and the specific decision:

feat(tasks): implement feature X