network/.github/workflows
Sergei Petrosian 4b3a45835e ci: Add tft plan and workflow
This change is for running tests in Testing Farm CI. This is a replacement for
BaseOS CI that we are currently using. Running it Testing Farm gives us more
control.

It adds a workflow for running tests, and a plans directory containing a test
plan and a README-plans.md with some info.

Note that this workflow runs from the main branch. This means that changes to
the workflow must be merged to main, then pull requests will be able to run it.
This is because the workflow uses on: issue_comment context, this is a security
measure recommended by GitHub. It saves us from leaking organization secrets.

The functionality is WIP, so await future fixes and updates.

Signed-off-by: Sergei Petrosian <spetrosi@redhat.com>
2024-07-24 21:29:05 +02:00
..
ansible-lint.yml ci: ansible-lint action now requires absolute directory 2024-06-26 08:53:58 -06:00
ansible-managed-var-comment.yml ci: tox-lsr 3.4.0 - fix py27 tests; move other checks to py310 2024-06-04 18:09:20 -06:00
ansible-plugin-scan.yml ci: tox-lsr 3.4.0 - fix py27 tests; move other checks to py310 2024-06-04 18:09:20 -06:00
ansible-test.yml ci: ansible-lint action now requires absolute directory 2024-06-26 08:53:58 -06:00
build_docs.yml build(deps): bump actions/checkout from 3 to 4 2023-10-02 14:56:28 -06:00
changelog_to_tag.yml ci: Bump mathieudutour/github-tag-action from 6.1 to 6.2 2024-04-02 10:56:39 -04:00
codeql.yml ci: Bump github/codeql-action from 2 to 3 2024-01-03 13:24:24 -07:00
integration.yml build(deps): bump actions/checkout from 3 to 4 2023-10-02 14:56:28 -06:00
markdownlint.yml build(deps): bump actions/checkout from 3 to 4 2023-10-02 14:56:28 -06:00
pr-title-lint.yml build(deps): bump actions/checkout from 3 to 4 2023-10-02 14:56:28 -06:00
python-unit-test.yml ci: tox-lsr 3.4.0 - fix py27 tests; move other checks to py310 2024-06-04 18:09:20 -06:00
shellcheck.yml build(deps): bump actions/checkout from 3 to 4 2023-10-02 14:56:28 -06:00
test_converting_readme.yml build(deps): bump actions/checkout from 3 to 4 2023-10-02 14:56:28 -06:00
tft.yml ci: Add tft plan and workflow 2024-07-24 21:29:05 +02:00
weekly_ci.yml ci: bump actions/github-script from 6 to 7 2023-12-01 14:56:36 -07:00
woke.yml build(deps): bump actions/checkout from 3 to 4 2023-10-02 14:56:28 -06:00